0032-9/(10 blank)
TM 9-2330-335-14&P
0032
FOLLOW-ON TASKS
00032
1.
Install brake drum (WP 0033).
2.
Install tire and wheel (WP 0021).
3.
Remove jack stands.
4.
Connect semitrailer to prime mover.
5.
Raise landing legs.
6.
Remove/store chocks and ground boards.
7.
Road test to check for proper/safe operation.
END OF TASK
END OF WORK PACKAGE