0039-3/(4 blank)
TM 9-2330-335-14&P
0039
INSTALLATION
00039
1.
Install two pipe plugs (Figure 1, Item 9), drain valve (Figure 1, Item 7), and pipe plug (Figure 1, Item 8) on rear
air reservoir (Figure 1, Item 6).
2.
Install rear air reservoir (Figure 1, Item 6) on mounts using four hex screws (Figure 1, Item 5), washers (Figure 1, Item 4),
two rubber pads (Figure 1, Item 3), and four new locknuts (Figure 1, Item 2).
3.
Install drain valve (Figure 1, Item 7) and pipe plug (Figure 1, Item 8) on front air reservoir (Figure 1, Item 1).
4.
Install front air reservoir (Figure 1, Item 1) on mounts using four hex screws (Figure 1, Item 5), washers
(Figure 1, Item 4), two rubber pads (Figure 1, Item 3), and four new locknuts (Figure 1, Item 2).
END OF TASK
FOLLOW-ON TASKS
00039
1.
Install ECU control valve on rear tank (WP 0035).
2.
Connect semitrailer to prime mover.
3.
Remove tire chocks.
4.
Raise landing legs.
5.
Remove/store ground boards.
6.
Pressurize system.
7.
Check for air leaks.
8.
Road test to ensure safe operation.
END OF TASK
END OF WORK PACKAGE