TM 9-2330-335-14&P
0040-2
0040
REMOVAL
00040
1.
Remove air brake chamber control valve (Figure 1, Item 3) with nipple (Figure 1, Item 1) attached from front air
reservoir.
2.
Remove nipple (Figure 1, Item 1) and two pipe plugs (Figure 1, Item 2) from air brake chamber control valve
(Figure 1, Item 3).
Figure 1.
Air Brake Chamber Control Valve.
040
END OF TASK
INSTALLATION
00040
1.
Install nipple (Figure 1, Item 1) in air brake chamber control valve (Figure 1, Item 3) at RES port. Install two
pipe plugs (Figure 1, Item 2).
2.
Install air brake chamber control valve (Figure 1, Item 3) with nipple (Figure 1, Item 1) in front air reservoir.
END OF TASK
FOLLOW-ON TASKS
00040
1.
Couple semitrailer to prime mover.
2.
Remove tire chocks from both sides and store.
3.
Raise landing legs.
4.
Remove/store ground boards.
5.
Check for air leakage.
6.
Road test to check for proper/safe operation.
END OF TASK
END OF WORK PACKAGE
447-0070