TM 9-2330-335-14&P
0037-6
0037
FOLLOW-ON TASKS
00037
1.
Connect semitrailer to prime mover.
2.
Raise landing legs.
3.
Remove/store chocks and ground boards.
4.
Pressurize system and check for leaks.
5.
Road test system to ensure proper operation.
END OF TASK
END OF WORK PACKAGE