TM 9-2330-335-14&P
0038-2
0038
REMOVAL
00038
1.
Loosen jamnut (Figure 1, Item 5). Remove cotter pin, pin, and yoke assembly (Figure 1, Item 4), and jamnut.
Discard cotter pin.
2.
Remove two locknuts (Figure 1, Item 3), washers (Figure 1, Item 2), and air brake chamber (Figure 1, Item 1). Discard
locknuts.
Figure 1.
Air Brake Chamber.
038
END OF TASK
INSTALLATION
00038
1.
Install air brake chamber (Figure 1, Item 1), two washers (Figure 1, Item 2), and new locknuts (Figure 1, Item 3).
2.
Install jamnut (Figure 1, Item 5), yoke assembly, pin, and new cotter pin (Figure 1, Item 4). Tighten jamnut.
END OF TASK
FOLLOW-ON TASKS
00038
1.
Connect semitrailer to prime mover.
2.
Remove tire chocks.
3.
Raise landing legs.
4.
Remove/store ground boards.
5.
Pressurize system.
6.
Check system for air leaks.
7.
Road test to check for safe opeation.
END OF TASK
END OF WORK PACKAGE
447-0068