TM 9-2330-335-14&P
0042-2
0042
REMOVAL
00042
1.
Remove packing (Figure 1, Item 3) from gladhand (Figure 1, Item 4).
2.
Remove three self-tapping screws (Figure 1, Item 2) and pull out gladhand (Figure 1, Item 4). Discard self-tapping
screws.
3.
Disconnect hose (Figure 1, Item 1) and remove gladhand (Figure 1, Item 4).
Figure 1.
Gladhands.
042
END OF TASK
INSTALLATION
00042
1.
Connect hose (Figure 1, Item 1) to gladhand (Figure 1, Item 4).
2.
Install gladhand (Figure 1, Item 4) and three new self-tapping screws (Figure 1, Item 2).
3.
Install packing (Figure 1, Item 3) on gladhand (Figure 1, Item 4).
END OF TASK
FOLLOW-ON TASKS
00042
1.
Lubricate swing arm with 10-wt. oil.
2.
Connect semitrailer to prime mover.
3.
Raise landing legs.
4.
Remove/store chocks and ground boards.
5.
Check for air leaks.
END OF TASK
END OF WORK PACKAGE
44-0009