TM-9-2330-342-10

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2012

  TM-9-2330-342-10 - Page 138 of 500

Preparation For Loading - Continued
2
4
3
1
Figure 4.
Preparation for Loading.
8.
Pull out knob (Figure 4, Item 2) and lock load locks (Figure 4, Item 4). Ensure load
lock indicator pins are OUT.
9.
Refer to trailer hookup procedures (WP
0010).
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-10
0018
0018-4


Back to Top