OPERATOR MAINTENANCE
CART HAND WINCH OPERATION
INITIAL SETUP:
Equipment Condition
Wheels chocked. (WP
0020)
CART HAND WINCH OPERATION AT FRONT OF TRAILER
1.
Remove cart hand winch (Figure 1, Item 6) and crank handle (Figure 1, Item 7) from
BII stowage box (Figure 1, Item 1).
1
6
7
10
9
8
4
2
3
5
Figure 1.
Cart Hand Winch Operation at Front of Trailer.
2.
Install cart hand winch (Figure 1, Item 6) on trailer bumper (Figure 1, Item 10) and
turn knob (Figure 1, Item 9) clockwise until cart hand winch (Figure 1, Item 6) is secure.
3.
Push winch lock (Figure 1, Item 8) down to OFF position.
4.
Pull strap (Figure 1, Item 5) to cart (Figure 1, Item 2).
5.
Route strap (Figure 1, Item 5) through center hole (Figure 1, Item 3) and around
bottom of cart (Figure 1, Item 2).
6.
Attach strap hook (Figure 1, Item 4) to strap (Figure 1, Item 5).
TM 9-2330-342-10
0028
0028-1