TM-9-2330-342-10

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2012

  TM-9-2330-342-10 - Page 399 of 500

OPERATOR MAINTENANCE
OPERATOR'S PMCS - BEFORE
INITIAL SETUP:
References
WP
0010
WP
0012
WP
0024
WP
0025
References (cont.)
WP
0027
WP
0057
WP
0058
Table
1.
OPERATOR'S PMCS - BEFORE.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
1
Before
Air Lines
(Connectors to
Towing Vehicle).
Visually inspect intervehicular
air lines (Figure 1, Item 2) to the
towing vehicle for cracks and
damaged gladhand seals
(Figure 1, Item 1).
Intervehicular cables
and gladhand seals are
damaged or missing.
2
1
Figure 1.
PMCS Before.
TM 9-2330-342-10
0048
0048-1


Back to Top