Table
1.
OPERATOR'S PMCS - BEFORE - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
3
Before
ISO Locks
Check ISO locks (Figure 2, Item
1) for proper operation
(WP
0024).
ISO locks do not
operate properly.
4
5
1
2
3
Figure 2.
PMCS Before.
Check ISO locks (Figure 2, Item
1) for damage.
ISO locks are damaged
or missing.
TM 9-2330-342-10
0048
0048-5