TM 9-2350-238-20-1
2-175. MAINTENANCE OF HEATER INSTALLATION KIT—BATTERY
COVERS.
BOX AND
This task covers:
a.
Removal
b.
Inspection/Repair
c.
Installation
INITIAL SETUP
Materials/Parts
General Safety Instructions
Cotter pin (4)
References
TM 9-2350-238-24P-1
Disconnect ground leads first and
connect ground leads last when
Equipment Conditions
removing or installing electrical leads.
Master switch in OFF position
1
2
3
4
5
6
7
Remove battery insulation pad (1).
Disconnect both ground leads first
when removing electrical leads from
batteries.
Remove ten hexagon plain nuts (2), ten
flat washers (3), two battery holddown
plates (4), and three battery retaining
plates (5).
Remove four cotter pins (6), four flat
washers (7), four headed straight pins (8),
and four battery holddown rod end
connectors (9) from battery box (10).
Remove batteries. Refer to page 2-840.
Remove three plate assembly anchors
(11) from battery box (10).
Remove eight hexagon head capscrews
(12), eight flat washers (13), and battery
heating pad (14) from battery box (10).
Remove battery box (10) from vehicle.
2-1009