TM 9-2350-238-20-1
2-176. MAINTENANCE OF HEATER INSTALLATION KIT—HOSES AND FITTINGS
(CONT).
INSTALLATION (CONT)
4
Position air purge valve angle bracket (7)
on hull heater kit, and secure with new
Iockwasher (8) and machine screw (9).
5
Install straight adapter (10) and nut (11)
on air purge two-way control valve (12).
6
Install air purge two-way control valve (12)
on air purge valve angle bracket (7) and
secure with nut (13).
7
Install two hose clamps (14) on nonmetal-
lic hose (15), and install nonmetallic hose
on straight adapter (10) and bottom of bat-
tery compartment.
8
Install two hose clamps (16) on rubber
hose (17), and install rubber hose on drain
cock (5).
9
Install two hose clamps (18) on rubber
hose (19), and install rubber hose on drain
cock (6).
2-1014