TM 9-2350-238-20-1
2-156. MAINTENANCE OF SUSPENSION LOCKOUT SYSTEM CONTROL VALVE AND
ASSOCIATED
INSTALLATION (CONT)
27
28
29
PARTS (CONT).
Install new tube fitting locknut (60) on tube
elbow (61).
Install new preformed packing (62) and
packing retainer (63) in selector control
plug valve (44). Install tube elbow (61) in
selector control plug valve, and tighten
tube fitting locknut (60).
Connect metal tube assembly (39) to tube
elbow (61 ).
2-157. MAINTENANCE OF SUSPENSION SYSTEM HYDRAULIC LINES AND FITTINGS
(RIGHT SIDE) AND ATTACHING HARDWARE.
This task covers:
a.
Removal
b.
Inspection/Repair
c. Installation
INITIAL SETUP
Materials/Parts
General Safety Instructions
Locknut (5)
Locknut (2)
Lockwasher (9)
Preformed packing (4)
●
To avoid injury to personnel, do not
Preformed packing (2)
tighten or loosen hydraulic fittings
when system is pressurized.
References
TM 9-2350-238-20-2
●
Lower the boom to stowed position
TM 9-2350-238-24P-1
before doing any maintenance on
hydraulic system.
Equipment Conditions
2-382
Powerplant removed
●
Wipe up any spilled hydraulic fluid to
2-918 Access cover removed
prevent injury to personnel.
2-923 Cover plate removed
Equipment stowage box removed from cab
well (TM 9-2350-238-20-2)
2-894