TM-9-2350-238-20-2

CRANE (CAB) COMPONENTS RECOVERY VEHICLE, FULL TRACKED: LIGHT,ARMORED, M578

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL

MAY 1993
CHANGE 1

  TM-9-2350-238-20-2 - Page 196 of 495

TM 9-2350-238-20- 2
2-51. MAINTENANCE OF WINCH LEVEL WIND (CONT) .
INSTALLATION
1
Install winch level wind (1) and secur e
3
Install two quick release pins (9) to secur e
2
with four flat washers (2), four ne w
yoke level wind bracket (5) to winch leve l
Iockwashers (3), and four hexagon hea d
wind (1) .
capscrews (4) .
4
Install two loop clamps (10), two ne w
Install yoke level wind bracket (5), tw o
Iockwashers (11), two hexagon capscrew s
flat washers (6), two hexagon hea d
(12), and two hexagon plain nuts (13) .
capscrews (7), and two new self-lockin g
nuts (8) .
5
Connect four electrical connectors (14) .
2-15 6


Back to Top