TM-9-2350-238-20-2

CRANE (CAB) COMPONENTS RECOVERY VEHICLE, FULL TRACKED: LIGHT,ARMORED, M578

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL

MAY 1993
CHANGE 1

  TM-9-2350-238-20-2 - Page 204 of 495

WARNING
TM 9-2350-238-20- 2
2-52. MAINTENANCE OF BOOM AND WINCH, BOOM, PULLEY, AND RELATED PART S
(CONT) .
INSTALLATIO N
Sling boom as shown to prevent un -
balanced boom action which coul d
cause serious injury .
Use hoist with 2000 lb (908 kg )
minimum lifting capacity to preven t
injury to personnel and damage t o
equipment .
NOT E
Start engine and activate boom cyl-
inders to aid in aligning boom cylin-
der eyes .
Another M578 Recoverv Vehicle o r
an M88A1 Recovery Vehicle, i f
available, may be used for lifting .
1
Using hoist with a lifting capacity of 200 0
lb (908 kg), lower crane boom (1) an d
align boom eyes with cylinder eyes an d
cab eyes .
2
Install two lower hinge headless straigh t
pins (2) to crane boom (1) .
3
Install two nut and pin boom hinge pi n
locking plates (3), two new Iockwasher s
(4), and two hexagon capscrews (5 )
securing two lower hinge headless straigh t
pins (2) .
2-16 4


Back to Top