TM 9-2350-238-24P-2
page 2-8
TM 9-2350-238-20- 2
1
2
3
Install direct turret traverse control linear
valve (1), three new Iockwashers (2) ,
three hexagon plain nuts (3), and thre e
hexagon head capscrews (4) .
Install new preformed packing (5), tub e
nipple (6), new preformed packing (7), fla t
washer (8), new tube fitting locknut (9) ,
and tube elbow (10) .
Connect control valve output line meta l
tube assembly (11) and output metal tub e
assembly (12) to direct turret travers e
control linear valve (1) .
4
Install five new preformed packings (13 )
and five tube nipples (14) .
5
Connect high pressure metal tub e
assembly (15), control valve metal tub e
assembly (16), and control valve retur n
metal tube assembly (17) to direct turre t
traverse control linear valve (1) and flow
divider hydraulic manifold (18) .
2-63. MAINTENANCE OF TRAVERSING SYSTEM CONTROL SOLENOID VALVE S
HYDRAULIC LINES AND FITTINGS .
Change 1
2-20 1