TM-9-2350-256-10

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

OPERATOR'S MANUAL

OCTOBER 2014

  TM-9-2350-256-10 - Page 677 of 796

OPERATOR MAINTENANCE
ROADWHEEL REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
General mechanic's tool kit
(WP 0135, Table 1, Item 2)
Hand hammer, 10 lb
(WP 0132, Table 2, Item 31)
Ratchet, 3/4-in. drive
(WP 0132, Table 2, Item 34)
Roadwheel lifter
(WP 0135, Table 1, Item 3)
Socket wrench socket, 1-5/16 in., 3/4-in. drive
(6 point) (WP 0132, Table 2, Item 53)
Tanker bar (crowbar pinch, 5 ft)
(WP 0132, Table 2, Item 12)
Wire brush (WP 0135, Table 1, Item 1)
Materials/Parts
Rubber gloves Qty: AR
(WP 0134, Table 1, Item 16)
Materials/Parts (cont.)
Self-locking nut Qty: 10
(WP 0132, Table 1, Item 36)
Wiping rags Qty: AR (WP 0134, Table 1, Item 57)
Personnel Required
Crewman (3)
References
Chocking vehicle (WP 0103)
Driving the vehicle (WP 0014)
Shut down main engine (WP 0017)
Starting main engine (WP 0010)
Track disconnect and connect (WP 0106)
Transmission shift selection (WP 0012)
TM 9-2350-256-10
0115
0115-1


Back to Top