TM 9-2350-260-20-1-3
MASTER CONTROL PANEL REPAIR (Sheet 52 of 71)
Bilge Pump Circuit Breaker Lead Assembly Replacement (Sheet 1 of 2)
SUPPLIES: Silicone compound (Item 32, Appendix D)
PRELIMINARY PROCEDURE:
Remove panel from tank (page 10-54)
NOTE
This procedure is used only when a bilge pump switch is present.
REMOVAL:
1.
Remove electrical lead connector (A) circuit 920 from bilge pump circuit breaker (B).
2.
Remove electrical lead connector (A) circuit 920 from power connector (C).
3.
Remove electrical lead (A) circuit 920 from panel.
Go on to Sheet 2
TA147146
10-114