TM-9-2350-261-34

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

  TM-9-2350-261-34 - Page 243 of 785

TM 9-2350-261-34
REPLACE INSTRUMENT PANEL BATTERY AND GENERATOR GAUGES
WIRING HARNESS — Continued
0029 00
4.
Disconnect circuit 15 lead (1) from instrument panel wiring harness (2).
5.
Disconnect circuit 14 lead (3) from panel wiring harness (2).
6.
Disconnect circuit 10 lead (4) from panel circuit breaker (5).
7.
Disconnect circuit 27E lead (6) from battery generator gauge (7).
8.
Remove panel wiring harness (2) from instrument panel (8).
9.
Remove eight locknuts (9), washers (10), and screws (11). Separate master switch panel (12) from distribution box (13).
Discard locknuts.
10. Remove screw (14), circuit 450A lead (15), and harness lead (2) from bus bar (16).
11. Remove panel wiring harness lead (2) from distribution box (13).
INSTALLATION
1.
Install harness lead (2) through hole in top of distribution box (13). Secure harness lead and circuit 450A lead (15)
to bus bar (16) with screw (14).
2.
Install master switch panel (12) on distribution box (13). Secure with eight screws (11), washers (10), and new locknuts
(9).
3.
Connect circuit 27E lead (6) to battery generator gauge (7).
4.
Connect circuit 10 lead (4) to instrument panel circuit breaker (5).
5.
Connect circuit 14 lead (3) to instrument panel wiring harness (2).
0029 00-2


Back to Top