TM 9-2350-273-BD
ARMAMENT AND FIRE CONTROL SYSTEMS
Procedural Steps (Cont'd)
8. Using boom, lift gun mount and tube assembly and re-install into turret.
9. Re-install trunnion bearings.
10. Reconnect elevating mechanism.
11. Record the BDAR action taken. When the mission is completed, as soon as
practicable, repair tank using standard maintenance procedures.
10-12. GUN TUBE INTERCHANGEABILITY
General Information:
Gun tube is damaged and requires replacement. The 105MM gun tubes are
interchangeable on the M48A5, M60A1, M60A3,M1, the British L7A1 and the German
L7A3 Tanks.
Limitations:
●
None
Personnel/Time Required:
●
2 soldiers
●
1-2 hours
Materials/Tools:
●
Lift capability
Procedural Steps:
1. Remove heat shields, if applicable.
2. Attach block and tackle or boom
from wrecker, to bottom of tube.
3. Remove pin holding gun tube in place.
4. Using girth wrench, turn gun tube
one-eight turn counterclockwise or to
unlock-position mark on shield.
5. Attach guide ropes to end of
6. Remove tube assembly.
tube.
7. Insert replacement gun tube into
shield assembly.
10-20