TM 9-2350-273-BD
ARMAMENT AND FIRE CONTROL SYSTEMS
Procedural Steps (Cont'd)
c.
Remove the four bolts that hold motor to pump mount.
d.
Remove four bolts that hold motor to power pack.
e. Remove blocks and lower motor into hole cut in basket floor.
4.
Install motor.
5. Record the BDAR action taken. When the mission is completed, as soon as
practicable, repair tank using standard maintenance procedures.
10-22
Figure 1. Turret Power Pack Replacement.