TM-9-2350-273-BD

M48/M60 SERIES TANK, COMBAT FULL-TRACKED 105-MM GUN

TECHNICAL MANUAL; OPERATORS, ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; BATTLEFIELD DAMAGE ASSESSMENT AND REPAIR

  TM-9-2350-273-BD - Page 81 of 288

TM 9-2350-273-BD
COOLING SYSTEM
Procedural Steps (Cont'd)
5. Reinstall rear deck.
6. When both fan assemblies are defective, the vehicle must be recovered.
7. Record the BDAR action taken. When the mission is completed, as soon as
practicable, repair tank using standard maintenance procedures.
5-4


Back to Top