TM 9-2350-277-20-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS — Continued
0155 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
6)
Remove fill plug and preformed
packing from top of tank.
7)
Fill hydraulic tank with FRH to bring
level halfway in sight glass. Hydraulic
tank takes approximately 3 1/2 quarts.
See Hydraulic System Lubrication
Table(Table7
,page015500-18)
.
8)
Install fill plug with new preformed
packingintopoftank
.
h.
When changing from OHA to FRH
hydraulic fluid, flush tank as follows.
1)
Drain and fill tank. See Step 68g.
2)
Raise and lower ramp several times.
See TM 9-2350-277-10.
3)
Drain and fill tank again (Step 68g).
4)
Test hydraulic ramp system.
0155 00-102
Change 5