TM-9-2350-277-20-3

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 3 OF 6

  TM-9-2350-277-20-3 - Page 85 of 941

TM 9-2350-277-20-3
REPLACE NATO AUXILIARY POWER (SLAVE) RECEPTACLE (M577A3 AND M1068A3
ONLY) — Continued
0264 00
4.
Pull receptacle (12) away from adapter (13).
5.
Remove screw (14), lockwasher (15), and circuit 6 lead (16) from positive terminal of receptacle (12). Discard
lockwasher.
6.
Remove screw (17), lockwasher (18) and circuit 50 lead (8) from negative terminal of receptacle (12). Discard
lockwasher.
7.
Remove four screws (19), lockwashers (20), and washers (21) from adapter (13). Discard lockwashers.
8.
Remove receptacle (12), gasket (22), insulator (23), adapter (13), and gasket (24) from hull. Discard gaskets.
9.
Remove insulator bushing (25) from hull.
0264 00-2
Change 2
REMOVAL
1.
Remove seven screws (1), lockwashers (2), washers (3), and harness protector (4) from hull. Discard lockwashers.
2.
Remove screw (5), washer (6), clamp (7), and circuit 50 lead (8) from hull weldnut.
3.
Remove four screws (9), lockwashers (10), and washers (11) from receptacle (12). Discard lockwashers.


Back to Top