TM-9-2350-277-20-3

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 3 OF 6

  TM-9-2350-277-20-3 - Page 80 of 941

TM 9-2350-277-20-3
REPLACE MASTER SWITCH (M113A3, M1059A3, M1064A3, AND M58
ONLY) — Continued
0262 00
INSTALLATION
NOTE
Make sure nameplate is not installed upside down.
1.
Align master switch (4) and nameplate (7) on master switch panel (8). Secure with two screws (6) and new locknuts (5).
2.
Place knob (3) on master switch (4). Secure with washer (2) and screw (1).
3.
Install conductor bus (9) with attached leads on terminal (10). Secure with new lockwasher (11) and nut (12).
4.
Install circuit 49 lead (13) and circuit 50 lead (14) on terminal (15). Secure with new lockwasher (16) and nut (17).
5.
Install master switch panel (8) on distribution box (18). Secure with eight screws (19), washers (20), and new locknuts
(21).
6.
Connect circuit 37 lead (22) to connector (23).
026200-3
Change 5


Back to Top