TM-9-2350-311-10

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; OPERATOR’S MANUAL

NOVEMBER 1994

  TM-9-2350-311-10 - Page 276 of 775

TM 9--2350--311--10
2--178
Change 6
2--12 PREPARATION FOR FIRING — CONTINUED
2--12.2
Boresighting — Continued
c. Checking M140/M140A1 Alinement Device While Boresighting on Test Target — Continued
4
Check alinement of M140/M140A1 alinement device (27) reticle against reticle of M117/M117A2
panoramic telescope (18) laid on left hand butterfly aiming diagram (15) of test target. Reticles should
aline within 0.5 mil.
5
Remove M140/M140A1 alinement device (27) from in front of panoramic telescope ballistic cover (29)
and install on dovetail door wedge (28) in front of M42 tank periscope (30) cover door (31).


Back to Top