TM-9-2350-311-10

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; OPERATOR’S MANUAL

NOVEMBER 1994

  TM-9-2350-311-10 - Page 277 of 775

TM 9--2350--311--10
Change 6
2--179
2--12 PREPARATION FOR FIRING — CONTINUED
2--12.2
Boresighting — Continued
c. Checking M140/M140A1 Alinement Device While Boresighting on Test Target — Continued
6
Check alinement of M140/M140A1 alinement device (27) reticle against reticle of M118A2/M118A3
elbow telescope (32) laid on right hand butterfly aiming diagram (15) of test target. Reticles should aline
within 0.5 mil.
7
If M140/M140A1 alinement device (27) does not aline with M118A2/M118A3 elbow telescope (32) or
M117/M117A2 panoramic telescope (18) reticles, notify unit maintenance.


Back to Top