TM-9-2350-311-10

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; OPERATOR’S MANUAL

NOVEMBER 1994

  TM-9-2350-311-10 - Page 291 of 775

TM 9-2350-311-10
2-12 PREPARATION FOR FIRING — CONTINUED
2-12.3 Standard Angle Method
a. Determining the Standard Angle
NOTE
When performing fire control alinement tests and measurements, ensure the gun trunnions are
leveled using the plumbline method (para 3-7.3) and that the M1451M145A1 telescope mount is
scribed (para 3-7.9).
1
Perform fire control alinement tests and measurements (para 3-7).
2
Inspect recuperator assembly pins (1) to ensure that the recoil system contains the proper amount of
hydraulic fluid (item 12, Appx G).
NOTE
The scribe line at the junction of the variable recoil cylinder and the machine bushing verifies that
the recoiling and non-recoiling parts of the howitzer have the same relationship as when the
standard angle was determined during fire control alinement tests.
3
Scribe a line at the junction of the variable recoil cylinder (2) and the machine bushing (3).
Change 2
2-193


Back to Top