TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 347 of 1275

TM 9-2350-311-20-1
CONTINUED FROM STEP C
D
1. Reconnect bulkhead-to-driver’s instrument
panel wiring harness to main light switch.
2. Place a jumper wire from socket G (lead 16)
and socket E (lead 18) of dimmer switch
connector.
3. Turn MASTER switch ON and check
headlights for operation.
4. Turn MASTER switch OFF.
I
Do headlights operate?
Replace dimmer switch (para 8-37).
1. Reconnect bulkhead-to-driver’s instrument
Panel wiring harness to dimmer switch.
2. Remove headlight assembly (para 8-21).
3. Place red lead of multimeters in socket B (lead
17) and black lead to ground.
4. Turn MASTER switch ON and check for
voltage.
5. Place red lead of multimeters in socket A (lead
18) and black lead to ground.
6. Check for voltage.
7. Turn MASTER switch OFF.
Is voltage present in both locations?
Replace headlight assembly (para 8-21 ).
wiring harnes (para 8-47).
Repair or replace leads 17 and/or 18 of
bulkhead-to-headlight/bilge pump
END OF TASK
3-247


Back to Top