TM 9-2350-311 -20-1
b.
c.
d.
5
Disconnect terminal (14) at bilge pump circuit breaker (15) by removing nut (16).
Disassembly
Disassemble lead assembly (para 2-13).
Assembly
Assemble lead assembly (para 2-13).
Installation
1
2
3
4
5
Connect terminal (14) at bilge pump circuit breaker (15) by installing nut (1 6).
Install connector (13), four screws (12), four washers (11 ), four new Iockwashers (10), and four nuts (9) to
bulkhead (8).
Connect power lead wiring harness (7) to bulkhead (8).
Connect connector (3) at master relay (6).
Install two batteries (4) and clamp (5).
NOTE
FOLLOW-ON MAINTENANCE:
Connect batteries para 8-28)
8-197