10-22 FINAL DRIVE ASSEMBLIES —
CONTINUED
c. Installation — Continued
7
8
9
10
Install six new Iockwashers (11) and six screws (10).
Install remaining new Iockwasher (15), screws (14), flat washers (16), and nuts (17). Torque screws to 290-
300 Ib-ft (393-407 N•m).
Install vent tube (5), clamp (3), washer (2), and screw (1).
Install drain plug (6). Fill final drive assembly with oil (para 2-15). If leakage occurs, notify support
maintenance.
FOLLOW-ON
NOTE
MAINTENANCE:
Install final drive sprocket and
hub (para 10-21)