TM 9-2350-358-BD
4-18.
OIL PAN HOLES - CONTINUED
NOTE
Allow adhesive to harden.
2.
Fill puncture and surrounding area with adhesive.
3.
Replenish oil supply and check for leaks.
4.
Record the BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system
using standard maintenance procedures.
Option 5
Limitations:
Repair may loosen and leak due to heat and/or improper cleaning of damaged area.
Personnel/Time Required:
•
1 soldier
•
0.5 hour
Materials/Tools:
•
Adhesive (item 1, Appendix C)
•
Plug, wooden (scavenge from available source)
•
Solvent, Drycleaning, Type 1 (item 59, Appendix C)
References:
LO 9-2350-314-12
Procedural Steps:
4-24