TM-9-2350-358-BD

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A6

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT SUPPORT MAINTENANCE

MARCH 1994

  TM-9-2350-358-BD - Page 49 of 343

TM 9-2350-358-BD
3-8.
WIRING HARNESS, DAMAGED - CONTINUED
Materials/Tools:
Serviceable connector (scavenge from available source)
Tape, insulation, electrical (item 63, Appendix C)
Procedural Steps:
1.
Turn off MASTER rower switch.
2.
Cut wires, as shown, to remove damaged connector.
3.
Splice corresponding wires (para 3-10).
4.
Wrap tape around first splice and leave hanging.
5.
Cut and splice next corresponding wire, approximately 1 inch from first splice
6.
Wrap tape around second splice without breaking tape from first splice.
7.
Repeat these steps until all spices are completed.
8.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
Option 2
Limitations:
None
Personnel/Time Required:
1 soldier
Time determined by location and amount of damage.
Materials/Tools:
Tape, insulation, electrical (item 63, Appendix C)
Wire, electrical, 20 AWG (American Wire Gage) (item 78, Appendix C)
3-4


Back to Top