TM 9-2350-358-BD
3-27.
PULLEY, DAMAGED - CONTINUED
2.
Grease cable and place on pulley.
3.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
Option 2
Limitations:
Cable life will be decreased.
Personnel/Time Required:
•
1-2 soldiers
•
Time determined by location and amount of damage
Materials/Tools:
•
Bolt (scavenge from available source)
•
Flat washers, two required (scavenge from available source)
•
Grease, aircraft (item 33, Appendix C)
Procedural Steps:
1.
Replace pulley with bolt and two flat washers.
2.
Grease cable and place between two flat washers.
3.
Adjust cable to proper tension, if possible.
4.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
3-28.
MECHANICAL CABLE, BROKEN
Mechanical cables can be severed or damaged in battlefield conditions.
Cable should be replaced when damaged.
When
replacement cable is not available, splice broken cables.
Option 1
Limitations:
None
Personnel/Time Required:
•
1 soldier
•
0.5 hour
Materials/Tools:
•
Clamp, cable, eight required (scavenge from available source)
•
Wire, braided (scavenge from available source)
3-33