TM-9-2350-358-BD

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A6

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT SUPPORT MAINTENANCE

MARCH 1994

  TM-9-2350-358-BD - Page 83 of 343

TM 9-2350-358-BD
3-29.
LINKAGE RETAINING DEVICES - CONTINUED
Option 3
Limitations:
None
Personnel/Time Required:
1 soldier
0.2 hour
Materials/Tools:
Bolt or nail (scavenge from available source)
Procedural Steps:
1.
Place bolt or nail through hole.
2.
Bend (nail) or peen (bolt) end of nail or bolt.
3.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
Option 4
Limitations:
None
Personnel/Time Required:
1 soldier
0.2 hour
Materials/Tools:
Bolt or nail (scavenge from available source)
Procedural Steps:
NOTE
Following option is for replacing alignment pins or dowels.
1.
Select bolt or nail that will fit tight in hole.
2.
Tap bolt or nail into the hole.
3.
Cut bolt or nail to proper length.
4.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
3-38


Back to Top