TM-9-2350-358-BD

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A6

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT SUPPORT MAINTENANCE

MARCH 1994

  TM-9-2350-358-BD - Page 80 of 343

TM 9-2350-358-BD
3-28.
MECHANICAL CABLE, BROKEN - CONTINUED
Procedural Steps:
NOTE
Ensure length of cable and splices will not restrict the operation of cable.
1.
Select length of cable where cable splices will not restrict range of cable travel.
NOTE
End of cable should extend at least 1 1/2 inches beyond clamp.
2.
Splice repair braided wire and broken cable with two clamps.
3.
Repeat step 2 for other end of broken cable.
4.
Adjust cable to proper tension, if possible.
5.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
Option 3
Limitations:
None
Personnel/Time Required:
1 solder
0.5 hour
Materials/Tools:
Sleeve, nicropress, four required (item 57, Appendix C)
Wire, braided (scavenge from available source)
3-35


Back to Top