3-28.
MECHANICAL CABLE, BROKEN - CONTINUED
Procedural Steps:
NOTE
Ensure length of cable and splices will not restrict the operation of
cable.
1.
Select length of cable where cable splices will not restrict range of cable travel.
2.
Loop end of repair braided wire and secure with two cable clamps.
3.
Thread broken cable end through loop.
4.
Make another loop with broken cable and secure with two cable clamps.
5.
Repeat steps 2 through 4 for other end of broken cable.
6.
Adjust cable to proper tension, if possible.
7.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
Option 2
Limitations:
None
Personnel/Time Required:
1 soldier
0.5 hour
Materials/Tools:
Clamp, cable, four required (scavenge from available source)
Wire, braided (scavenge from available source)
3-34