TM-9-2510-247-13-P

FIFTH WHEEL TOWING DEVICE MODEL 250M

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL, REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2004

  TM-9-2510-247-13-P - Page 226 of 522

TM 9-2510-247-13&P
0045 00
REMOVAL - Continued
3. Disconnect ground wire (5) from terminal post (6).
4. Disconnect solenoid to control box wire (7) and jumper wire (8) from terminal post (9).
5. Remove nuts (10) and lockwashers (11). Discard lockwashers.
6. Remove mounting bracket (12) from solenoid (13).
7. Remove solenoid (13).
0045 00-2
Follow-on Tasks:
None
INSTALLATION
1. Position solenoid (13) and secure with mounting bracket (12), nuts (10), and new
lockwashers (11).
2. Connect solenoid to control box wire (7) and jumper wire (8) to terminal post (9).
3. Connect ground wire (5) to terminal post (6).
4. Connect solenoid to battery wire (3) to terminal post (4).
5. Connect solenoid to hydraulic motor wire (1) to terminal post (2). Connect batteries
(WP 0050).
6. Turn ELECTRICAL switch to ON. Push motor control button for 2 seconds and release to
ensure the solenoids activate the hydraulic motors.
END OF WORK PACKAGE
Figure 81.
Solenoid Assembly


Back to Top