TM-9-2520-234-35

POWER TRAIN ASSEMBLY; ALLISON MODEL XTG411-2A

TECHNICAL MANUAL; FIELD AND DEPOT MAINTENANCE MANUAL

JULY 1962

  TM-9-2520-234-35 - Page 126 of 323

CHAP
5,
SEC
I I
DISASSEMBLY
PAR
75,
STEPS
39-4 2
Figure 103 (Step 39)
Using sling (A), position transmission main
housing on disassembly table, blocking as-
sembly so turbine shaft (B) clears the table.
Figure 104 (Step 40)
Using hoist and sling (A), remove the left-
brake hub and steer planetary assembly (B).
Using a 5/8-inch wrench, remove 18 bolts (C)
from left-brake anchor (D).
9 4
Figure 105 (Step 41)
Remove left-brake anchor assembly (A),
Figure 106 (Step 42)
Using three 7/16-14-inch bolts (A), attac h
sling (B) to left-clutch reaction plate assembly
(C). Remove the reaction plate assembly.


Back to Top