TM 9-2520-272-40
0020
SUSTAINMENT MAINTENANCE
REPLACE BRAKE COOLANT VALVE ASSEMBLY COMPONENTS
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic’s (GMTK) (WP 0079,
Item 45)
Wrench, Torque, Ratcheting, 1/2” Drive, 250 lb-ft
(WP 0079, Item 51)
Materials/Parts
Petrolatum, Technical (Petroleum Jelly) (WP 0078,
Item 12)
Retainer, Packing (WP 0080, Item 39)
Personnel Required
Track Vehicle Repairer, 91H10
Equipment Condition
Transmission removed from vehicle or container (TM
9-2350-277-13&P)
Oil f ll tube assembly removed (WP 0006)
Right cover assembly removed (WP 0016)
0020
‐
1