1. Position the assembled injection pump drive gearshaft
on flyweight housing.
2. Mate dowel pins (A) and bolt holes (B) in gearshaft
with dowel pin holes (C) and bolt holes (D) in housing.
(Refer to note fig. 6-193).
Note.
The scribe line on gearshaft flang e
and adjusting ring boss must be alined. (Refer to
note 6-175. )
1. Position six bolts (A) through advance vane housing
cover, housing, flyweight housing, and drive gearshaft
flange and install six slotted nuts (B) and cotter pins.
Install locking wire securing bolts.
2. Move the adjusting ring to aline scribe marks on ring,
flyweight, and drive gearshaft flange. Install two slotted
nuts (C), flat washers, and cotter pins and flyweight
pins securing adjusting ring.
3. Install intermediate bearing support (D).
Figure 6-197. Installing advance flyweigh t
adjusting ring and injection pump driv e
gearshaft attaching parts (adjustin g
ring secured with nuts) .
Figure 6-196. Installing injection pum p
drive gearshaft .