TM-9-2815-224-34-P

ENGINE, DIESEL:8-CYLINDER TURBOCHARGED, DETROIT DIESEL CORPORATION MODEL 8V92TA

DIRECT SUPPORT AND GENERAL SUPPORT MAINTENACE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JANUARY 1988

  TM-9-2815-224-34-P - Page 101 of 554

TM 9-2815-224-34&P
Cylinder Head Maintenance Instructions (Cont)
(11)
Install nine pipe plugs (31).
e.
Follow-on Maintenance.
(I)
Install valves (para 7-4).
(2)
Clean and test injectors (para 12-3).
(3)
Install fuel injectors (para 12-2).
(4)
Install exhaust valve bridges (para 7-8).
(5)
Install rocker arms (para 7-5).
(6)
Install engine brake retarder (para 11-2).
(7)
Install cylinder head (para 3-7).
(8)
Install fuel modulator, tube, and fittings (para 15-5.1).
END OF TASK
3-9. INJECTOR TUBE REMOVAL/INSTALLATION.
This task covers:
a. Removal
b. Installation
c. Follow-on Maintenance
INITIAL SETUP
Models
All
Test Equipment
None
Special Tools
Reconditioning set J22525
Gage, sled J22273
Gage, injector J25521
Equipment Condition
TM or Para
Condition Description
Para 11-2
Engine brake retarder
removed.
Para 7-5
Rocker arms removed.
Para 7-8
Exhaust valve bridges
removed.
Para 12-2
Fuel injectors removed.
Para 7-4
Exhaust valves
removed.
Supplies
Solvent, drycleaning, Item 60, Appendix C
Oil, lubricating, Item 54, Appendix C
Para 7-6
Cam followers and push
rods removed.
Special Environmental Conditions
None
Personnel Required
MOS 63W, Wheel vehicle repairer
References
None
General Safety Instructions
None
Level of Maintenance
General Support
Change 2
3-53


Back to Top