TM 9-2815-224-34&P
Valve Mechanism Maintenance Instructions (Cont)
(6)
Remove caps from four fuel line
connectors (8).
NOTE
Preformed packings must be installed dry. Do
not apply oil.
(7)
Install two fuel tubes (9 and 10) and four
preformed packings (10.1).
(8)
Tighten four nuts (11) to 160 lb-in.
(18.1 N•m) using fuel line nut wrench.
(9)
Loosen four nuts (11) slightly and
retighten to 10 lb-ft (14 N•m).
f.
Follow-on Maintenance.
(1)
Install throttle delay (right front rocker arm only) (engines equipped with throttle delay only)
(para 15-5).
(1.1)
Install fuel modulator (left rear rocker arms only) (engines equipped with fuel modulator only)
(para 15-5.1).
(2)
Install engine brake retarder (para 11-2).
(3)
Install engine brake wire harness (para 11-4).
(4)
Install rocker cover (TM 9-2320-279-20).
(5)
Connect batteries (TM 9-2320-279-20).
END OF TASK
7-6. CAM FOLLOWER/PUSH ROD REMOVAL/INSTALLATION.
This task covers:
a. Removal
b. Installation
c. Follow-on Maintenance
INITIAL SETUP
Models
All
Test Equipment
None
Special Tools
Gage, feeler FB310B
Supplies
Tags, identification, Item 61, Appendix C
Oil, lubricating, Item 48, Appendix C
Personnel Required
MOS 63W, Wheel vehicle repairer
References
Equipment Condition
TM or Para
Condition Description
Para 3-7
Cylinder head removed from
engine.
Para 7-5
Rocker arms removed.
Para 7-8
Exhaust valve bridge
removed.
Special Environmental Conditions
None
General Safety Instructions
None
Level of Maintenance
Direct Support
None
Change 2
7-11