PS Magazine - MARCH 1981

PS, The Preventative Maintenance Monthly

ISSUE 340

MARCH 1981

PS Magazine - MARCH 1981 - Page 32 of 35
PAINTING-
Before you cam±
n;,-"±'
ouflage paint ²he
shelter, be sure to
cover alL the data
1
plates with tape.
³eel it off after
painting.
JACK ASSEM´
µI
ES¶
Be suRe the plates are on solid ·roUnd and as
leveL as possible.
keep an eYe on the area where tHe jac¸ as¹emºly is bolted to tHe
. _± ² ³,
shel»er. ¼aisin·/Lowering the shelter in an uneven oR jer¸Y manner can
pulL a jac¸ assembly ou½ of the aluminum¾faced foam¿filled Honeycomb
k²³
paneL.
Àf walls are damagedÁ ²ape over tHe area to stop wa²er damage ²o ²He
honeycomb Un²iL permanent repairs are made .Â
_´µ
·:¸¹º»¼


Back to Top
Back to Top