TB-9-2320-279-13-1

TECHNICAL BULLETIN; AIR CONDITIONING SYSTEM

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TB-9-2320-279-13-1 - Page 413 of 524

TB 9-2320-279-13-1
0052-21
3. HOSE AND WIRE HARNESS ROUTING.
This task covers:
a.
Hose Routing.
b.
Wire Routing.
INITIAL SETUP
Models
All
Test Equipment
None
Special Tools
Torque Wrench
Supplies
Air Conditioning Wire Harness
(10) Cable Ties
Hose Assembly #6
Hose Assembly #8
Hose Assembly #10
High Pressure Switch
Low Pressure Switch
Air Conditioner Installation Label
Cushion Clip-3/4 in.
Cushion Clip-1 in.
Cushion Clip-1 1/8 in.
Screw-3/8-16 x 1 in.
(3) Locknut-3/8 in.
(3) Double Cushion Clip-3/4 in.
(2) Washer-3/8 in.
(2) Screw-3/8-16 x 1 1/4 in.
(2) Hose Shield
(3) Cable Tie
Double Cushion Clip-1 1/16 in.
Locknut-1/4 in.
20 amp Circuit Breaker
Personnel Required
MOS 52C, Utilities equipment repairer
References
None
Equipment Condition
None
Special Environmental Conditions
None
General Safety Instructions
None


Back to Top