TB-9-2320-279-13-1

TECHNICAL BULLETIN; AIR CONDITIONING SYSTEM

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TB-9-2320-279-13-1 - Page 421 of 524

TB 9-2320-279-13-1
0052-29
4. HEATER/EVAPORATOR INSTALLATION.
This task covers:
a.
Heater/Evaporator Installation.
b.
Follow-On Maintenance.
INITIAL SETUP
Models
All
Test Equipment
None
Special Tools
Nutsert Tool
Torque Wrench
Supplies
Heater/Evaporator
Lower Plenum
Damper
(2) Upper Plenum
(6) Screw-8-32 x 3/4 in.
Gasket-1/2 in. x 1/2 in.
Straight Fitting
Straight Fitting
Insulation
1300 3M Adhesive
(4) Grommet
PVC Foam Tape
(6) Lockwasher-1/4 in.
(6) Screw-1/4-20 x 3/4 in.
(8) Cable Tie
Fresh Air Box Opening Cover
PVC Foam Tape
(14) Screw-10-32 x 1/2 in.
Heat Cover
(4) Hole Plug-5/16 in.
(4) Hole Plug-3/8 in.
Hole Plug-3/4 in.
(4) Defrost Louver
(16) Threaded Insert
(16) Washer-#10
(16) Screw-10-32 x 3/4 in.
(12) Lockscrew-1/4-20 x 1/2 in.
Heater Compartment Center Cover
Heater Cable
Supplies (Cond’t)
Defrost Cable
Air Conditioner Cable
(4) Speed Nut-3/16 in.
Fan Label
Air Conditioner Temperature Label
Rotory Switch Kit
Optic Ribbon
(5) Bezel
(2) Wire Assembly
(2) Air Diffuser Ball
Heater Hose Elbow
(3) Hose Clamp
Personnel Required
MOS 52C, Utilities equipment repairer (3)
References
None
Equipment Condition
None
Special Environmental Conditions
None
General Safety Instructions
None


Back to Top