TB-9-2320-279-13-1

TECHNICAL BULLETIN; AIR CONDITIONING SYSTEM

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TB-9-2320-279-13-1 - Page 417 of 524

TB 9-2320-279-13-1
0052-25
17.
Install preformed packing (39) and
low pressure switch (40) on
hose 2522 (23).
Torque low
pressure switch (40) to 7.5-10 ft-lbs.
(10-14 N
m).
b.
Wire Harness Routing.
1.
Connect connector (1) of wire harness (2)
on connector (3).
2.
Secure connector (1) to two hoses (4 and 5)
with cable tie (6).
3.
Secure wire harness (2) to two hoses (4 and 5)
with three cable ties (7).


Back to Top