TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 116 of 460

TB 9-2320-279-13&P-2
LOWER BRUSH GUARD REPLACEMENT - CONTINUED
0019 00
0019 00-2
REMOVAL
1.
Remove six locknuts (1), washers (2), bolts (3), and washers (4) from front edge of both side blast shields (9). Discard
locknuts.
2.
Remove eight locknuts (5), washers (6), bolts (7), and washers (8) from front edge of both side blast shields (9). Discard
locknuts.
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
NOTE
Lower brush guard weighs 219 lb (99 kg).
3.
Attach two lifting links, sling, and lifting device to top edge of lower brush guard (13).


Back to Top