TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 121 of 460

TB 9-2320-279-13&P-2
LOUVERED GRILLE REPLACEMENT - CONTINUED
0020 00
0020 00-3/(0020 00-4 Blank)
CLEANING AND INSPECTION
Clean and inspect all parts IAW
General Maintenance Instructions
(WP 0011 00).
INSTALLATION
NOTE
Louvered grille brackets are marked “THIS SIDE TOWARD RADIATOR” and “THIS END UP.”
Ensure bracket orientation is correct before installation.
1.
Install two louvered grille brackets (11 and 10) on lower brush guard with six washers (7), bolts (6), washers (8), and
new locknuts (9). Tighten locknuts to 35 lb-ft (47 Nm).
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Failure to follow this warning may cause injury to personnel.
NOTE
When installing louvered grille panels, first insert end without bolt hole into right louvered grille
bracket.
When installing louvered grille panels, work from bottom to top.
Each louvered grille panel weighs approximately 30 lb (14 kg).
2.
Install five louvered grille panels (1) on louvered grille brackets (10 and 11).
3.
Install five washers (3), bolts (2), washers (4), and new locknuts (5) on left end of louvered grille panels (1). Tighten
locknuts to 35 lb-ft (47 Nm).
END OF WORK PACKAGE


Back to Top