TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 29 of 162

TB 9-2320-280-35-12
5-5
Figure 5-6.
2-12.
Using terminal strips (16) and (13) as templates locate, mark, and drill eight 0.201-in. diameter
holes (20) in battery box (2) rear wall.
2-13.
Secure one 8-position terminal strip (13) and one 6-position terminal strip (16) to battery box (2)
rear wall with eight bolts (14), washers (15), lockwashers (17), and nuts (18).
2-14.
Using shunt assembly (19) as template, locate, mark, and drill two .201-in. diameter holes (21) in
battery box (2) rear wall.
2-15.
Secure shunt assembly (19) to battery box (2) rear wall with two bolts (14), two washers (15),
two lockwashers (17), and two nuts (18).
14
14
13
2
15
15
20
21
19
18
17
16
17
18
1.66
1.125
2.25
1.00
4.25
1.66
~
13. TERMINAL STRIP (8-POLE) – 7527K28 – QTY. 1
14. SCREW – MS35207-267 – QTY. 10
15. WASHER – MS27183-8 – QTY. 10
16. TERMINAL STRIP (6-POLE) – 7527K26 – QTY. 1
17. LOCKWASHER – MS45904-60 – QTY. 10
18. NUT – MS35650-302 – QTY. 10
19. SHUNT ASSEMBLY – PKMM-000-013 – QTY. 1


Back to Top